Pumped Storage Hydro Plants in Connecticut
Every operating pumped storage hydro plant in Connecticut as of 2026-07: 1 plants, 3 generating units and 31 MW of nameplate capacity across 1 county, most of it inside ISO New England.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 3 generating units
- Nameplate capacity
- 31 MW
- Counties
- 1
- Grid operator
- ISO New England
- covers most of these plants
Map of pumped storage hydro plants in Connecticut
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Pumped storage · 1
List of pumped storage hydro plants in Connecticut
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Rocky River (CT)Hydroelectric Pumped Storage | FirstLight Power Resources Services LLC | Litchfield | 31 | 3 | 1928 | Operating |
|---|
Largest pumped storage hydro plants in Connecticut
- 1Rocky River (CT)Litchfield County, Connecticut31 MW
Pumped storage hydro plants by county in Connecticut
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Litchfield | 1 | 31 |
Pumped Storage Hydro Plants in Connecticut: FAQ
- How many pumped storage hydro plants are in Connecticut?
- 1, with 31 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of Connecticut pumped storage hydro plants?
- Yes — the map above. Each dot is one pumped storage hydro plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest pumped storage hydro plant in Connecticut?
- Rocky River (CT), at 31 MW. The table is sorted largest first, so the rest follow it.
- Is there a pumped storage hydro plant near me in Connecticut?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Connecticut's pumped storage hydro plants?
- Most of them sit inside ISO New England, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Hydroelectric pumped storage. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.