Pumped Storage Hydro Plants in Virginia

Every operating pumped storage hydro plant in Virginia as of 2026-07: 1 plants, 6 generating units and 3 GW of nameplate capacity across 1 county, most of it inside PJM.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
6 generating units
Nameplate capacity
3 GW
Counties
1
Grid operator
PJM
covers most of these plants

Map of pumped storage hydro plants in Virginia

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Pumped storage · 1

List of pumped storage hydro plants in Virginia

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

pumped storage hydro plants in Virginia
Bath CountyHydroelectric Pumped StorageVirginia Electric & Power CoBath2,86261985Operating

Largest pumped storage hydro plants in Virginia

  1. 1Bath CountyBath County, Virginia2,862 MW

Pumped storage hydro plants by county in Virginia

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Bath12,862

Pumped Storage Hydro Plants in Virginia: FAQ

How many pumped storage hydro plants are in Virginia?
1, with 3 GW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Virginia pumped storage hydro plants?
Yes — the map above. Each dot is one pumped storage hydro plant, sized by nameplate capacity and placed at its reported site.
Which is the largest pumped storage hydro plant in Virginia?
Bath County, at 3 GW. The table is sorted largest first, so the rest follow it.
Is there a pumped storage hydro plant near me in Virginia?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Virginia's pumped storage hydro plants?
Most of them sit inside PJM, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Hydroelectric pumped storage. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.