Pumped Storage Hydro Plants in Michigan
Every operating pumped storage hydro plant in Michigan on EIA-860M for 2026-07: 1 plants, 6 generating units and 2 GW of nameplate capacity across 1 county, most of it inside MISO.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 6 generating units
- Nameplate capacity
- 2 GW
- Counties
- 1
- Grid operator
- MISO
- covers most of these plants
Map of pumped storage hydro plants in Michigan
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Pumped storage · 1
List of pumped storage hydro plants in Michigan
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| LudingtonHydroelectric Pumped Storage | Consumers Energy Co - (MI) | Mason | 1,978.8 | 6 | 1973 | Operating |
Largest pumped storage hydro plants in Michigan
- 1LudingtonMason County, Michigan1,978.8 MW
Pumped storage hydro plants by county in Michigan
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Mason | 1 | 1,978.8 |
Pumped Storage Hydro Plants in Michigan: FAQ
- How many pumped storage hydro plants are in Michigan?
- 1, with 2 GW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Michigan pumped storage hydro plants?
- Yes — the map above. Each dot is one pumped storage hydro plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest pumped storage hydro plant in Michigan?
- Ludington, at 2 GW. The table is sorted largest first, so the rest follow it.
- Is there a pumped storage hydro plant near me in Michigan?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Michigan's pumped storage hydro plants?
- Most of them sit inside MISO, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Hydroelectric pumped storage. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.