Pumped Storage Hydro Plants in Tennessee
Every operating pumped storage hydro plant in Tennessee as of 2026-07: 1 plants, 4 generating units and 2 GW of nameplate capacity across 1 county.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 4 generating units
- Nameplate capacity
- 2 GW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of pumped storage hydro plants in Tennessee
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Pumped storage · 1
List of pumped storage hydro plants in Tennessee
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Raccoon MountainHydroelectric Pumped Storage | Tennessee Valley Authority | Hamilton | 1,713.6 | 4 | 1978 | Operating |
|---|
Largest pumped storage hydro plants in Tennessee
- 1Raccoon MountainHamilton County, Tennessee1,713.6 MW
Pumped storage hydro plants by county in Tennessee
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Hamilton | 1 | 1,713.6 |
Pumped Storage Hydro Plants in Tennessee: FAQ
- How many pumped storage hydro plants are in Tennessee?
- 1, with 2 GW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of Tennessee pumped storage hydro plants?
- Yes — the map above. Each dot is one pumped storage hydro plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest pumped storage hydro plant in Tennessee?
- Raccoon Mountain, at 2 GW. The table is sorted largest first, so the rest follow it.
- Is there a pumped storage hydro plant near me in Tennessee?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Tennessee's pumped storage hydro plants?
- No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Tennessee is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Hydroelectric pumped storage. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.