Intel Folsom

Intel Folsom is a 1 MW solar farm in Sacramento County, California, operated by Tesla Inc.. EIA-860M lists 2 generating units here. Its units entered service in 2010.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1 MW
1 MW net summer
Generating units
2
In service
2010
EIA plant ID
58086

Where it is

Loading map…
County
Sacramento County, California
Coordinates
38.6451, -121.173
Balancing authority
BANC
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tesla Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Tesla Inc. reports to EIA →

Intel Folsom: FAQ

Where is Intel Folsom?
In Sacramento County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Intel Folsom?
1 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Intel Folsom?
EIA-860M names Tesla Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Intel Folsom LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tesla Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Intel Folsom LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Intel Folsom still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.