Intel Folsom Phase 2

Intel Folsom Phase 2 is a 1 MW solar farm in Sacramento County, California, operated by Tesla Inc.. EIA-860M lists 1 generating unit here. Its unit entered service in 2012.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1 MW
1 MW net summer
Generating units
1
In service
2012
EIA plant ID
58954

Where it is

Loading map…
County
Sacramento County, California
Coordinates
38.6436, -121.1639
Balancing authority
BANC
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tesla Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Tesla Inc. reports to EIA →

Intel Folsom Phase 2: FAQ

Where is Intel Folsom Phase 2?
In Sacramento County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Intel Folsom Phase 2?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Intel Folsom Phase 2?
EIA-860M names Tesla Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Intel Folsom Phase 2 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tesla Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Intel Folsom Phase 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Intel Folsom Phase 2 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.