Genentech Vacaville Meter #1
Genentech Vacaville Meter #1 is a 6 MW solar farm in Solano County, California, operated by Tesla Inc.. It has 2 generating units here, inside CAISO. Its units entered service in 2017.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 6.1 MW
- 6.1 MW net summer
- Generating units
- 2
- In service
- 2017
- Plant code
- 60844
Where it is
Loading map…
- County
- Solano County, California
- Coordinates
- 38.3908, -121.9478
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Tesla Inc.
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Genentech Vacaville Meter #1: FAQ
- Where is Genentech Vacaville Meter #1?
- In Solano County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Genentech Vacaville Meter #1?
- 6 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Genentech Vacaville Meter #1?
- Tesla Inc. is the operator of record. That is not always the ultimate owner.
- Is this the same as Genentech Vacaville Meter #1 LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Tesla Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Genentech Vacaville Meter #1 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Genentech Vacaville Meter #1 still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.