UC Merced Solar Hybrid

UC Merced Solar Hybrid is a 5 MW solar farm in Merced County, California, operated by MN8 Energy LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2018.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5 MW
4.8 MW net summer
Generating units
2
In service
2018
Plant code
61995

Where it is

Loading map…
County
Merced County, California
Coordinates
37.3657, -120.4322
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
MN8 Energy LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 5 MW, Battery 1 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by MN8 Energy LLC →

UC Merced Solar Hybrid: FAQ

Where is UC Merced Solar Hybrid?
In Merced County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is UC Merced Solar Hybrid?
5 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns UC Merced Solar Hybrid?
MN8 Energy LLC is the operator of record. That is not always the ultimate owner.
Is this the same as UC Merced Solar Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — MN8 Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "UC Merced Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is UC Merced Solar Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.