UC Riverside Lots 30 & 32
UC Riverside Lots 30 & 32 is a 4 MW solar farm in Riverside County, California, operated by MN8 Energy LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2017.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 4 MW
- 3.5 MW net summer
- Generating units
- 1
- In service
- 2017
- Plant code
- 62016
Where it is
Loading map…
- County
- Riverside County, California
- Coordinates
- 33.9704, -117.331
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- MN8 Energy LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
UC Riverside Lots 30 & 32: FAQ
- Where is UC Riverside Lots 30 & 32?
- In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is UC Riverside Lots 30 & 32?
- 4 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns UC Riverside Lots 30 & 32?
- MN8 Energy LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as UC Riverside Lots 30 & 32 LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — MN8 Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "UC Riverside Lots 30 & 32 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is UC Riverside Lots 30 & 32 still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.