UC Riverside Lots 30 & 32

UC Riverside Lots 30 & 32 is a 4 MW solar farm in Riverside County, California, operated by MN8 Energy LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
4 MW
3.5 MW net summer
Generating units
1
In service
2017
Plant code
62016

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.9704, -117.331
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
MN8 Energy LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by MN8 Energy LLC →

UC Riverside Lots 30 & 32: FAQ

Where is UC Riverside Lots 30 & 32?
In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is UC Riverside Lots 30 & 32?
4 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns UC Riverside Lots 30 & 32?
MN8 Energy LLC is the operator of record. That is not always the ultimate owner.
Is this the same as UC Riverside Lots 30 & 32 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — MN8 Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "UC Riverside Lots 30 & 32 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is UC Riverside Lots 30 & 32 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.