Grossmont HS Solar Project

Grossmont HS Solar Project is a 1 MW solar farm in San Diego County, California, operated by MN8 Energy LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2018.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.4 MW
1.3 MW net summer
Generating units
1
In service
2018
Plant code
62987

Where it is

Loading map…
County
San Diego County, California
Coordinates
32.8165, -116.9996
Balancing authority
CISO
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
MN8 Energy LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by MN8 Energy LLC →

Grossmont HS Solar Project: FAQ

Where is Grossmont HS Solar Project?
In San Diego County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Grossmont HS Solar Project?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Grossmont HS Solar Project?
MN8 Energy LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Grossmont HS Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — MN8 Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Grossmont HS Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Grossmont HS Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.