Fresno Bullard High School Hybrid

Fresno Bullard High School Hybrid is a 2 MW solar farm in Fresno County, California, operated by Forefront Power, LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.6 MW
1.6 MW net summer
Generating units
2
In service
2020
Plant code
63420

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.8186, -119.8104
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Forefront Power, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 1 MW, Battery 0 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by Forefront Power, LLC →

Fresno Bullard High School Hybrid: FAQ

Where is Fresno Bullard High School Hybrid?
In Fresno County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Fresno Bullard High School Hybrid?
2 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Fresno Bullard High School Hybrid?
Forefront Power, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Fresno Bullard High School Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Forefront Power, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Fresno Bullard High School Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Fresno Bullard High School Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.