Fresno Bullard High School Hybrid
Fresno Bullard High School Hybrid is a 2 MW solar farm in Fresno County, California, operated by Forefront Power, LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2020.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 1.6 MW
- 1.6 MW net summer
- Generating units
- 2
- In service
- 2020
- Plant code
- 63420
Where it is
Loading map…
- County
- Fresno County, California
- Coordinates
- 36.8186, -119.8104
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Forefront Power, LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 1 MW, Battery 0 MW. It is listed here under Solar, the energy source with the most capacity.
Fresno Bullard High School Hybrid: FAQ
- Where is Fresno Bullard High School Hybrid?
- In Fresno County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Fresno Bullard High School Hybrid?
- 2 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Fresno Bullard High School Hybrid?
- Forefront Power, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Fresno Bullard High School Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Forefront Power, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Fresno Bullard High School Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Fresno Bullard High School Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.