Slate Hybrid

Slate Hybrid is a 440 MW solar farm in Kings County, California, operated by MN8 Energy LLC. EIA-860M lists 9 generating units here, inside CAISO. Its units entered service between 2021 and 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
440.3 MW
440.3 MW net summer
Generating units
9
In service
2021–2022
EIA plant ID
63727

Where it is

Loading map…
County
Kings County, California
Coordinates
36.227, -119.8948
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
MN8 Energy LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 300 MW, Battery 140 MW. It is filed here under Solar, the source with the most capacity.

Every plant MN8 Energy LLC reports to EIA →

Slate Hybrid: FAQ

Where is Slate Hybrid?
In Kings County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Slate Hybrid?
440 MW of nameplate capacity across 9 units, as of the EIA-860M release for 2026-07.
Who owns Slate Hybrid?
EIA-860M names MN8 Energy LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Slate Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — MN8 Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Slate Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Slate Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.