EMWD - Moreno Valley RWRF

EMWD - Moreno Valley RWRF is a 2 MW solar farm in Riverside County, California, operated by SkyHigh 2 Solar. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2.4 MW
2.4 MW net summer
Generating units
1
In service
2021
EIA plant ID
64406

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.8683, -117.2141
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SkyHigh 2 Solar
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant SkyHigh 2 Solar reports to EIA →

EMWD - Moreno Valley RWRF: FAQ

Where is EMWD - Moreno Valley RWRF?
In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is EMWD - Moreno Valley RWRF?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns EMWD - Moreno Valley RWRF?
EIA-860M names SkyHigh 2 Solar as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as EMWD - Moreno Valley RWRF LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — SkyHigh 2 Solar here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "EMWD - Moreno Valley RWRF LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is EMWD - Moreno Valley RWRF still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.