SkyHigh 2 Solar power plants
Every generating plant EIA-860M files against SkyHigh 2 Solar for 2026-07: 15 plants, 42 MW of nameplate capacity, across 6 states and 1 energy source.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 15
- Nameplate capacity
- 42 MW
- States
- 6
- AZ, CA, CO, HI, MA, TX
- Energy sources
- 1
SkyHigh 2 Solar plants by energy source
- Solar15 plants · 42 MW
Full list of SkyHigh 2 Solar power plants
| BYU - Hawaii2 technologies | SkyHigh 2 Solar | Honolulu | 5 | 2 | 2021 | Operating |
| Niagara Bottling - SeguinSolar Photovoltaic | SkyHigh 2 Solar | Guadalupe | 4.9 | 1 | 2021 | Operating |
| EMWD - San Jacinto RES BCTSolar Photovoltaic | SkyHigh 2 Solar | Riverside | 4.2 | 1 | 2022 | Operating |
| Niagara Bottling - RialtoSolar Photovoltaic | SkyHigh 2 Solar | San Bernardino | 4.2 | 1 | 2021 | Operating |
| California State Univ at Channel IslandsSolar Photovoltaic | SkyHigh 2 Solar | Ventura | 3.7 | 1 | 2021 | Operating |
| EMWD - Perris Valley RWRFSolar Photovoltaic | SkyHigh 2 Solar | Riverside | 3.4 | 1 | 2021 | Operating |
| TES RowtierSolar Photovoltaic | SkyHigh 2 Solar | Worcester | 3 | 1 | 2021 | Operating |
| Amazon TUS2Solar Photovoltaic | SkyHigh 2 Solar | Pima | 2.6 | 1 | 2022 | Operating |
| EMWD - Moreno Valley RWRFSolar Photovoltaic | SkyHigh 2 Solar | Riverside | 2.4 | 1 | 2021 | Operating |
| CSU San Jose State UniversitySolar Photovoltaic | SkyHigh 2 Solar | Santa Clara | 1.7 | 1 | 2021 | Operating |
| Firestone Walker Brewery - Phase 1Solar Photovoltaic | SkyHigh 2 Solar | San Luis Obispo | 1.6 | 1 | 2020 | Operating |
| EMWD - Sun City RWRFSolar Photovoltaic | SkyHigh 2 Solar | Riverside | 1.6 | 1 | 2021 | Operating |
| El Dorado CountySolar Photovoltaic | SkyHigh 2 Solar | El Dorado | 1.5 | 1 | 2021 | Operating |
| EMWD - San Jacinto RWRF NEMSolar Photovoltaic | SkyHigh 2 Solar | Riverside | 1.3 | 1 | 2021 | Operating |
| TruStile Doors - DenverSolar Photovoltaic | SkyHigh 2 Solar | Adams | 1.2 | 1 | 2021 | Operating |
SkyHigh 2 Solar: FAQ
- How many power plants does SkyHigh 2 Solar operate?
- EIA-860M lists 15 operating plants against “SkyHigh 2 Solar” for 2026-07, totalling 42 MW of nameplate capacity in 6 states.
- Is SkyHigh 2 Solar the owner of these plants?
- EIA-860M names one reporting entity per generator. That entity operates the plant on the survey; ownership can sit with a parent, a partnership or a tax-equity structure that the form does not record.
- Why are affiliates listed separately?
- Because EIA files them separately. Rolling subsidiaries into a parent would need an ownership map EIA-860M does not publish, so this page does not invent one.