Amazon - Stockton - Roof (SCK1) - (CA)
Amazon - Stockton - Roof (SCK1) - (CA) is a 3 MW solar farm in San Joaquin County, California, operated by Forefront Power, LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 2.6 MW
- 2.6 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 64429
Where it is
Loading map…
- County
- San Joaquin County, California
- Coordinates
- 37.9117, -121.1987
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Forefront Power, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Amazon - Stockton - Roof (SCK1) - (CA): FAQ
- Where is Amazon - Stockton - Roof (SCK1) - (CA)?
- In San Joaquin County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Amazon - Stockton - Roof (SCK1) - (CA)?
- 3 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Amazon - Stockton - Roof (SCK1) - (CA)?
- Forefront Power, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Amazon - Stockton - Roof (SCK1) - (CA) LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Forefront Power, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Amazon - Stockton - Roof (SCK1) - (CA) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Amazon - Stockton - Roof (SCK1) - (CA) still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.