CA - Madera USD - Madera South HS

CA - Madera USD - Madera South HS is a 1 MW solar farm in Madera County, California, operated by Forefront Power, LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.2 MW
1.2 MW net summer
Generating units
1
In service
2023
Plant code
65615

Where it is

Loading map…
County
Madera County, California
Coordinates
36.95, -120.05
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Forefront Power, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Forefront Power, LLC →

CA - Madera USD - Madera South HS: FAQ

Where is CA - Madera USD - Madera South HS?
In Madera County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is CA - Madera USD - Madera South HS?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns CA - Madera USD - Madera South HS?
Forefront Power, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as CA - Madera USD - Madera South HS LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Forefront Power, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CA - Madera USD - Madera South HS LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is CA - Madera USD - Madera South HS still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.