Grossmont-Cuyamaca-Cuyamaca Col. Solar &
Grossmont-Cuyamaca-Cuyamaca Col. Solar & is a 2 MW solar farm in San Diego County, California, operated by Forefront Power, LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2024.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 2.4 MW
- 2.4 MW net summer
- Generating units
- 2
- In service
- 2024
- Plant code
- 66023
Where it is
Loading map…
- County
- San Diego County, California
- Coordinates
- 32.7466, -116.9389
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Forefront Power, LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 1 MW, Battery 1 MW. It is listed here under Solar, the energy source with the most capacity.
Grossmont-Cuyamaca-Cuyamaca Col. Solar &: FAQ
- Where is Grossmont-Cuyamaca-Cuyamaca Col. Solar &?
- In San Diego County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Grossmont-Cuyamaca-Cuyamaca Col. Solar &?
- 2 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Grossmont-Cuyamaca-Cuyamaca Col. Solar &?
- Forefront Power, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Grossmont-Cuyamaca-Cuyamaca Col. Solar & LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Forefront Power, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Grossmont-Cuyamaca-Cuyamaca Col. Solar & LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Grossmont-Cuyamaca-Cuyamaca Col. Solar & still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.