Palmer Solar

Palmer Solar is a 60 MW solar farm in El Paso County, Colorado, operated by Deriva Energy. It has 1 generating unit here. Its unit entered service in 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
60 MW
60 MW net summer
Generating units
1
In service
2020
Plant code
62495

Where it is

Loading map…
County
El Paso County, Colorado
Coordinates
38.6299, -104.6526
Balancing authority
WACM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Deriva Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Deriva Energy →

Palmer Solar: FAQ

Where is Palmer Solar?
In El Paso County, Colorado (CO). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Palmer Solar?
60 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Palmer Solar?
Deriva Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Palmer Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Deriva Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Palmer Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Palmer Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.