Pike Solar Hybrid

Pike Solar Hybrid is a 175 MW solar farm in El Paso County, Colorado, operated by Deriva Energy. EIA-860M lists 1 generating unit here. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
175 MW
175 MW net summer
Generating units
1
In service
2023
EIA plant ID
64212

Where it is

Loading map…
County
El Paso County, Colorado
Coordinates
38.6217, -104.5814
Balancing authority
PSCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Deriva Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Deriva Energy reports to EIA →

Pike Solar Hybrid: FAQ

Where is Pike Solar Hybrid?
In El Paso County, Colorado (CO). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Pike Solar Hybrid?
175 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Pike Solar Hybrid?
EIA-860M names Deriva Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Pike Solar Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Deriva Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pike Solar Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Pike Solar Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.