Pike Solar Hybrid
Pike Solar Hybrid is a 175 MW solar farm in El Paso County, Colorado, operated by Deriva Energy. It has 1 generating unit here. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 175 MW
- 175 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 64212
Where it is
Loading map…
- County
- El Paso County, Colorado
- Coordinates
- 38.6217, -104.5814
- Balancing authority
- PSCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Deriva Energy
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Pike Solar Hybrid: FAQ
- Where is Pike Solar Hybrid?
- In El Paso County, Colorado (CO). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Pike Solar Hybrid?
- 175 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Pike Solar Hybrid?
- Deriva Energy is the operator of record. That is not always the ultimate owner.
- Is this the same as Pike Solar Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Deriva Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pike Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Pike Solar Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.