Gulf Coast Solar Center III

Gulf Coast Solar Center III is a 50 MW solar farm in Escambia County, Florida, operated by Arevon Energy, Inc.. EIA-860M lists 1 generating unit here. Its unit entered service in 2017.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
50 MW
50 MW net summer
Generating units
1
In service
2017
EIA plant ID
59691

Where it is

Loading map…
County
Escambia County, Florida
Coordinates
30.4704, -87.3352
Balancing authority
SOCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Arevon Energy, Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Arevon Energy, Inc. reports to EIA →

Gulf Coast Solar Center III: FAQ

Where is Gulf Coast Solar Center III?
In Escambia County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Gulf Coast Solar Center III?
50 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Gulf Coast Solar Center III?
EIA-860M names Arevon Energy, Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Gulf Coast Solar Center III LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Arevon Energy, Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Gulf Coast Solar Center III LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Gulf Coast Solar Center III still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.