Castle Gap Solar Hybrid

Castle Gap Solar Hybrid is a 190 MW solar farm in Upton County, Texas, operated by Upton County Solar 2 LLC. It has 2 generating units here, inside ERCOT. Its units entered service between 2018 and 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
189.9 MW
189.9 MW net summer
Generating units
2
In service
2018–2019
Plant code
60123

Where it is

Loading map…
County
Upton County, Texas
Coordinates
31.255, -102.272
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Upton County Solar 2 LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 180 MW, Battery 10 MW. It is listed here under Solar, the energy source with the most capacity.

Castle Gap Solar Hybrid: FAQ

Where is Castle Gap Solar Hybrid?
In Upton County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Castle Gap Solar Hybrid?
190 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Castle Gap Solar Hybrid?
Upton County Solar 2 LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Castle Gap Solar Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Upton County Solar 2 LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Castle Gap Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Castle Gap Solar Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.