East Pecos Solar

East Pecos Solar is a 119 MW solar farm in Pecos County, Texas, operated by Southern Power Co. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
118.5 MW
118.5 MW net summer
Generating units
1
In service
2017
Plant code
60436

Where it is

Loading map…
County
Pecos County, Texas
Coordinates
31.0009, -102.2817
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Southern Power Co
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Southern Power Co →

East Pecos Solar: FAQ

Where is East Pecos Solar?
In Pecos County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is East Pecos Solar?
119 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns East Pecos Solar?
Southern Power Co is the operator of record. That is not always the ultimate owner.
Is this the same as East Pecos Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Southern Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "East Pecos Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is East Pecos Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.