RE Maplewood

RE Maplewood is a 250 MW solar farm in Pecos County, Texas, operated by Onward Energy. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
250 MW
250 MW net summer
Generating units
2
In service
2021
EIA plant ID
61346

Where it is

Loading map…
County
Pecos County, Texas
Coordinates
30.9766, -102.2578
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Onward Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Onward Energy reports to EIA →

RE Maplewood: FAQ

Where is RE Maplewood?
In Pecos County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is RE Maplewood?
250 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns RE Maplewood?
EIA-860M names Onward Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as RE Maplewood LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Onward Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "RE Maplewood LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is RE Maplewood still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.