Marlin Solar

Marlin Solar is a 5 MW solar farm in Limestone County, Texas, operated by Cypress Creek Renewables. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5.3 MW
5.3 MW net summer
Generating units
1
In service
2017
Plant code
61513

Where it is

Loading map…
County
Limestone County, Texas
Coordinates
31.2867, -96.8772
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cypress Creek Renewables
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Cypress Creek Renewables →

Marlin Solar: FAQ

Where is Marlin Solar?
In Limestone County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Marlin Solar?
5 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Marlin Solar?
Cypress Creek Renewables is the operator of record. That is not always the ultimate owner.
Is this the same as Marlin Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Cypress Creek Renewables here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Marlin Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Marlin Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.