Sterling Solar (TX)

Sterling Solar (TX) is a 10 MW solar farm in Hunt County, Texas, operated by Cypress Creek Renewables. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2018.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
10 MW
10 MW net summer
Generating units
1
In service
2018
Plant code
61871

Where it is

Loading map…
County
Hunt County, Texas
Coordinates
33.1662, -96.1726
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cypress Creek Renewables
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Cypress Creek Renewables →

Sterling Solar (TX): FAQ

Where is Sterling Solar (TX)?
In Hunt County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Sterling Solar (TX)?
10 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Sterling Solar (TX)?
Cypress Creek Renewables is the operator of record. That is not always the ultimate owner.
Is this the same as Sterling Solar (TX) LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Cypress Creek Renewables here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sterling Solar (TX) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Sterling Solar (TX) still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.