Fighting Jays Solar Project

Fighting Jays Solar Project is a 228 MW solar farm in Fort Bend County, Texas, operated by AP Solar 2, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2022.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
227.5 MW
227.5 MW net summer
Generating units
1
In service
2022
Plant code
62945

Where it is

Loading map…
County
Fort Bend County, Texas
Coordinates
29.3584, -95.7464
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AP Solar 2, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Fighting Jays Solar Project: FAQ

Where is Fighting Jays Solar Project?
In Fort Bend County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Fighting Jays Solar Project?
228 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Fighting Jays Solar Project?
AP Solar 2, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Fighting Jays Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AP Solar 2, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Fighting Jays Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Fighting Jays Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.