Brightside
Brightside is a 51 MW solar farm in Bee County, Texas, operated by Luminant Generation Company LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2022.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 50.7 MW
- 50.7 MW net summer
- Generating units
- 1
- In service
- 2022
- EIA plant ID
- 63223
Where it is
Loading map…
- County
- Bee County, Texas
- Coordinates
- 28.431, -97.8896
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Luminant Generation Company LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Every plant Luminant Generation Company LLC reports to EIA →
Brightside: FAQ
- Where is Brightside?
- In Bee County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Brightside?
- 51 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Brightside?
- EIA-860M names Luminant Generation Company LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Brightside LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Luminant Generation Company LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Brightside LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Brightside still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.