Brightside

Brightside is a 51 MW solar farm in Bee County, Texas, operated by Luminant Generation Company LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
50.7 MW
50.7 MW net summer
Generating units
1
In service
2022
EIA plant ID
63223

Where it is

Loading map…
County
Bee County, Texas
Coordinates
28.431, -97.8896
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Luminant Generation Company LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Luminant Generation Company LLC reports to EIA →

Brightside: FAQ

Where is Brightside?
In Bee County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Brightside?
51 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Brightside?
EIA-860M names Luminant Generation Company LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Brightside LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Luminant Generation Company LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Brightside LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Brightside still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.