2W Permian Solar Project Hybrid

2W Permian Solar Project Hybrid is a 460 MW solar farm in Andrews County, Texas, operated by 2W Permian Solar, LLC. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
460 MW
460 MW net summer
Generating units
2
In service
2021
EIA plant ID
63255

Where it is

Loading map…
County
Andrews County, Texas
Coordinates
32.1164, -102.5283
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
2W Permian Solar, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 420 MW, Battery 40 MW. It is filed here under Solar, the source with the most capacity.

Every plant 2W Permian Solar, LLC reports to EIA →

2W Permian Solar Project Hybrid: FAQ

Where is 2W Permian Solar Project Hybrid?
In Andrews County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is 2W Permian Solar Project Hybrid?
460 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns 2W Permian Solar Project Hybrid?
EIA-860M names 2W Permian Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as 2W Permian Solar Project Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — 2W Permian Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "2W Permian Solar Project Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is 2W Permian Solar Project Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.