Wagyu

Wagyu is a 120 MW solar farm in Brazoria County, Texas, operated by Cubico USA, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
120 MW
120 MW net summer
Generating units
1
In service
2020
Plant code
63273

Where it is

Loading map…
County
Brazoria County, Texas
Coordinates
29.2423, -95.6581
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cubico USA, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Cubico USA, LLC →

Wagyu: FAQ

Where is Wagyu?
In Brazoria County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Wagyu?
120 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Wagyu?
Cubico USA, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Wagyu LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Cubico USA, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Wagyu LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Wagyu still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.