Crane Solar Project

Crane Solar Project is a 150 MW solar farm in Crane County, Texas, operated by Crane Solar Project, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
150 MW
150 MW net summer
Generating units
1
In service
2020
Plant code
63519

Where it is

Loading map…
County
Crane County, Texas
Coordinates
31.2544, -102.3117
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Crane Solar Project, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Crane Solar Project: FAQ

Where is Crane Solar Project?
In Crane County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Crane Solar Project?
150 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Crane Solar Project?
Crane Solar Project, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Crane Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Crane Solar Project, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Crane Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Crane Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.