Mockingbird Solar Center

Mockingbird Solar Center is a 471 MW solar farm in Lamar County, Texas, operated by Mockingbird Solar Center, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
471 MW
471 MW net summer
Generating units
1
In service
2024
EIA plant ID
64347

Where it is

Loading map…
County
Lamar County, Texas
Coordinates
33.3917, -95.4252
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Mockingbird Solar Center, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Mockingbird Solar Center, LLC reports to EIA →

Mockingbird Solar Center: FAQ

Where is Mockingbird Solar Center?
In Lamar County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Mockingbird Solar Center?
471 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Mockingbird Solar Center?
EIA-860M names Mockingbird Solar Center, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Mockingbird Solar Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Mockingbird Solar Center, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Mockingbird Solar Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Mockingbird Solar Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.