Noble Solar

Noble Solar is a 400 MW solar farm in Denton County, Texas, operated by Geronimo Power. It has 2 generating units here, inside ERCOT. Its units entered service in 2022.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
400 MW
400 MW net summer
Generating units
2
In service
2022
Plant code
65271

Where it is

Loading map…
County
Denton County, Texas
Coordinates
33.2615, -97.2381
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Geronimo Power
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 275 MW, Battery 125 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by Geronimo Power →

Noble Solar: FAQ

Where is Noble Solar?
In Denton County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Noble Solar?
400 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Noble Solar?
Geronimo Power is the operator of record. That is not always the ultimate owner.
Is this the same as Noble Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Geronimo Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Noble Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Noble Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.