Waco Solar

Waco Solar is a 400 MW solar farm in Limestone County, Texas, operated by Waco Solar, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
400 MW
400 MW net summer
Generating units
1
In service
2024
Plant code
65762

Where it is

Loading map…
County
Limestone County, Texas
Coordinates
31.7104, -96.8187
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Waco Solar, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Waco Solar: FAQ

Where is Waco Solar?
In Limestone County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Waco Solar?
400 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Waco Solar?
Waco Solar, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Waco Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Waco Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Waco Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Waco Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.