Cutlass Solar II

Cutlass Solar II is a 203 MW solar farm in Fort Bend County, Texas, operated by Cutlass II Solar LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
202.8 MW
200 MW net summer
Generating units
1
In service
2024
Plant code
66262

Where it is

Loading map…
County
Fort Bend County, Texas
Coordinates
29.39, -95.78
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cutlass II Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Cutlass Solar II: FAQ

Where is Cutlass Solar II?
In Fort Bend County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Cutlass Solar II?
203 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Cutlass Solar II?
Cutlass II Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Cutlass Solar II LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Cutlass II Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cutlass Solar II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Cutlass Solar II still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.