Cutlass Solar 1 LLC
Cutlass Solar 1 LLC is a 111 MW solar farm in Fort Bend County, Texas, operated by Cutlass Solar 1, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2022.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 110.9 MW
- 110.9 MW net summer
- Generating units
- 1
- In service
- 2022
- Plant code
- 66310
Where it is
Loading map…
- County
- Fort Bend County, Texas
- Coordinates
- 29.4097, -95.734
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Cutlass Solar 1, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Cutlass Solar 1 LLC: FAQ
- Where is Cutlass Solar 1 LLC?
- In Fort Bend County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Cutlass Solar 1 LLC?
- 111 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Cutlass Solar 1 LLC?
- Cutlass Solar 1, LLC is the operator of record. That is not always the ultimate owner.
- Is Cutlass Solar 1 LLC still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.