BKV-BPP Ponder Solar

BKV-BPP Ponder Solar is a 3 MW solar farm in Denton County, Texas, operated by PPM Solar LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2.5 MW
2.5 MW net summer
Generating units
1
In service
2024
Plant code
66571

Where it is

Loading map…
County
Denton County, Texas
Coordinates
33.1558, -97.2546
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
PPM Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

BKV-BPP Ponder Solar: FAQ

Where is BKV-BPP Ponder Solar?
In Denton County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is BKV-BPP Ponder Solar?
3 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns BKV-BPP Ponder Solar?
PPM Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as BKV-BPP Ponder Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — PPM Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "BKV-BPP Ponder Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is BKV-BPP Ponder Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.