Fence Post Solar Hybrid Project, LLC
Fence Post Solar Hybrid Project, LLC is a 308 MW solar farm in Navarro County, Texas, operated by Fence Post Solar Project, LLC. It has 2 generating units here, inside ERCOT. Its units entered service in 2024.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 308 MW
- 306 MW net summer
- Generating units
- 2
- In service
- 2024
- Plant code
- 66801
Where it is
Loading map…
- County
- Navarro County, Texas
- Coordinates
- 32.0728, -96.2239
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Fence Post Solar Project, LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 236 MW, Battery 72 MW. It is listed here under Solar, the energy source with the most capacity.
Fence Post Solar Hybrid Project, LLC: FAQ
- Where is Fence Post Solar Hybrid Project, LLC?
- In Navarro County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Fence Post Solar Hybrid Project, LLC?
- 308 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Fence Post Solar Hybrid Project, LLC?
- Fence Post Solar Project, LLC is the operator of record. That is not always the ultimate owner.
- Is Fence Post Solar Hybrid Project, LLC still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.