BT Hickerson Solar, LLC

BT Hickerson Solar, LLC is a 310 MW solar farm in Bosque County, Texas, operated by BT Hickerson Solar, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
310 MW
310 MW net summer
Generating units
1
In service
2025
EIA plant ID
66903

Where it is

Loading map…
County
Bosque County, Texas
Coordinates
31.82, -97.5175
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
BT Hickerson Solar, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant BT Hickerson Solar, LLC reports to EIA →

BT Hickerson Solar, LLC: FAQ

Where is BT Hickerson Solar, LLC?
In Bosque County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is BT Hickerson Solar, LLC?
310 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns BT Hickerson Solar, LLC?
EIA-860M names BT Hickerson Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is BT Hickerson Solar, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.