Copperhead Solar, LLC

Copperhead Solar, LLC is a 250 MW solar farm in McLennan County, Texas, operated by Geronimo Power. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
250 MW
250 MW net summer
Generating units
2
In service
2024
EIA plant ID
67019

Where it is

Loading map…
County
McLennan County, Texas
Coordinates
31.45, -96.86
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Geronimo Power
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 150 MW, Battery 100 MW. It is filed here under Solar, the source with the most capacity.

Every plant Geronimo Power reports to EIA →

Copperhead Solar, LLC: FAQ

Where is Copperhead Solar, LLC?
In McLennan County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Copperhead Solar, LLC?
250 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Copperhead Solar, LLC?
EIA-860M names Geronimo Power as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is Copperhead Solar, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.