Pitts Dudik Solar
Pitts Dudik Solar is a 50 MW solar farm in Hill County, Texas, operated by Elawan Pitts Dudik Solar, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 49.6 MW
- 49.6 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 67024
Where it is
Loading map…
- County
- Hill County, Texas
- Coordinates
- 31.8932, -96.8751
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Elawan Pitts Dudik Solar, LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Pitts Dudik Solar: FAQ
- Where is Pitts Dudik Solar?
- In Hill County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Pitts Dudik Solar?
- 50 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Pitts Dudik Solar?
- Elawan Pitts Dudik Solar, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Pitts Dudik Solar LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Elawan Pitts Dudik Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pitts Dudik Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Pitts Dudik Solar still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.