Pitts Dudik Solar

Pitts Dudik Solar is a 50 MW solar farm in Hill County, Texas, operated by Elawan Pitts Dudik Solar, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
49.6 MW
49.6 MW net summer
Generating units
1
In service
2023
EIA plant ID
67024

Where it is

Loading map…
County
Hill County, Texas
Coordinates
31.8932, -96.8751
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Elawan Pitts Dudik Solar, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Elawan Pitts Dudik Solar, LLC reports to EIA →

Pitts Dudik Solar: FAQ

Where is Pitts Dudik Solar?
In Hill County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Pitts Dudik Solar?
50 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Pitts Dudik Solar?
EIA-860M names Elawan Pitts Dudik Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Pitts Dudik Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Elawan Pitts Dudik Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pitts Dudik Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Pitts Dudik Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.