Ganado Solar

Ganado Solar is a 221 MW solar farm in Jackson County, Texas, operated by Enel Green Power NA, Inc.. It has 2 generating units here, inside ERCOT. Its units entered service between 2023 and 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
221 MW
221 MW net summer
Generating units
2
In service
2023–2024
Plant code
67284

Where it is

Loading map…
County
Jackson County, Texas
Coordinates
29.1091, -96.5288
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Enel Green Power NA, Inc.
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 151 MW, Battery 71 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by Enel Green Power NA, Inc. →

Ganado Solar: FAQ

Where is Ganado Solar?
In Jackson County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Ganado Solar?
221 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Ganado Solar?
Enel Green Power NA, Inc. is the operator of record. That is not always the ultimate owner.
Is this the same as Ganado Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Enel Green Power NA, Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Ganado Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Ganado Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.