Stampede Solar Hybrid

Stampede Solar Hybrid is a 328 MW solar farm in Hopkins County, Texas, operated by Stampede Solar Project LLC. It has 2 generating units here, inside ERCOT. Its units entered service between 2024 and 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
328.1 MW
328.1 MW net summer
Generating units
2
In service
2024–2025
Plant code
67762

Where it is

Loading map…
County
Hopkins County, Texas
Coordinates
33.2013, -95.3192
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Stampede Solar Project LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 256 MW, Battery 72 MW. It is listed here under Solar, the energy source with the most capacity.

Stampede Solar Hybrid: FAQ

Where is Stampede Solar Hybrid?
In Hopkins County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Stampede Solar Hybrid?
328 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Stampede Solar Hybrid?
Stampede Solar Project LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Stampede Solar Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Stampede Solar Project LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stampede Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Stampede Solar Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.