Stampede Solar Hybrid
Stampede Solar Hybrid is a 328 MW solar farm in Hopkins County, Texas, operated by Stampede Solar Project LLC. It has 2 generating units here, inside ERCOT. Its units entered service between 2024 and 2025.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 328.1 MW
- 328.1 MW net summer
- Generating units
- 2
- In service
- 2024–2025
- Plant code
- 67762
Where it is
Loading map…
- County
- Hopkins County, Texas
- Coordinates
- 33.2013, -95.3192
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Stampede Solar Project LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 256 MW, Battery 72 MW. It is listed here under Solar, the energy source with the most capacity.
Stampede Solar Hybrid: FAQ
- Where is Stampede Solar Hybrid?
- In Hopkins County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Stampede Solar Hybrid?
- 328 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Stampede Solar Hybrid?
- Stampede Solar Project LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Stampede Solar Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Stampede Solar Project LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stampede Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Stampede Solar Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.