Stampede Solar Hybrid

Stampede Solar Hybrid is a 328 MW solar farm in Hopkins County, Texas, operated by Stampede Solar Project LLC. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service between 2024 and 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
328.1 MW
328.1 MW net summer
Generating units
2
In service
2024–2025
EIA plant ID
67762

Where it is

Loading map…
County
Hopkins County, Texas
Coordinates
33.2013, -95.3192
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Stampede Solar Project LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 256 MW, Battery 72 MW. It is filed here under Solar, the source with the most capacity.

Every plant Stampede Solar Project LLC reports to EIA →

Stampede Solar Hybrid: FAQ

Where is Stampede Solar Hybrid?
In Hopkins County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Stampede Solar Hybrid?
328 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Stampede Solar Hybrid?
EIA-860M names Stampede Solar Project LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Stampede Solar Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Stampede Solar Project LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stampede Solar Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Stampede Solar Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.