Liberty Hybrid Solar and Storage Project

Liberty Hybrid Solar and Storage Project is a 132 MW solar farm in Harris County, Texas, operated by Liberty 1 Solar LLC. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service between 2025 and 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
132.2 MW
132.2 MW net summer
Generating units
2
In service
2025–2026
EIA plant ID
67867

Where it is

Loading map…
County
Harris County, Texas
Coordinates
30.0097, -95.0408
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Liberty 1 Solar LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 67 MW, Battery 65 MW. It is filed here under Solar, the source with the most capacity.

Every plant Liberty 1 Solar LLC reports to EIA →

Liberty Hybrid Solar and Storage Project: FAQ

Where is Liberty Hybrid Solar and Storage Project?
In Harris County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Liberty Hybrid Solar and Storage Project?
132 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Liberty Hybrid Solar and Storage Project?
EIA-860M names Liberty 1 Solar LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Liberty Hybrid Solar and Storage Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Liberty 1 Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Liberty Hybrid Solar and Storage Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Liberty Hybrid Solar and Storage Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.