Liberty Hybrid Solar and Storage Project is a 132 MW solar farm in Harris County, Texas, operated by Liberty 1 Solar LLC. EIA-860M lists 2 generating units here, inside ERCOT. Its units entered service between 2025 and 2026.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 132.2 MW
- 132.2 MW net summer
- Generating units
- 2
- In service
- 2025–2026
- EIA plant ID
- 67867
Where it is
Loading map…
- County
- Harris County, Texas
- Coordinates
- 30.0097, -95.0408
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Liberty 1 Solar LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Solar 67 MW, Battery 65 MW. It is filed here under Solar, the source with the most capacity.
Liberty Hybrid Solar and Storage Project: FAQ
- Where is Liberty Hybrid Solar and Storage Project?
- In Harris County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Liberty Hybrid Solar and Storage Project?
- 132 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Liberty Hybrid Solar and Storage Project?
- EIA-860M names Liberty 1 Solar LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Liberty Hybrid Solar and Storage Project LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Liberty 1 Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Liberty Hybrid Solar and Storage Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Liberty Hybrid Solar and Storage Project still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.