Sequoia 1

Sequoia 1 is a 401 MW solar farm in Eastland County, Texas, operated by Sequoia 1 Solar Project. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
401.4 MW
401.4 MW net summer
Generating units
1
In service
2025
Plant code
68200

Where it is

Loading map…
County
Eastland County, Texas
Coordinates
32.4382, -99.1577
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Sequoia 1 Solar Project
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Sequoia 1: FAQ

Where is Sequoia 1?
In Eastland County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Sequoia 1?
401 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Sequoia 1?
Sequoia 1 Solar Project is the operator of record. That is not always the ultimate owner.
Is this the same as Sequoia 1 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Sequoia 1 Solar Project here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sequoia 1 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Sequoia 1 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.