Sequoia 1
Sequoia 1 is a 401 MW solar farm in Eastland County, Texas, operated by Sequoia 1 Solar Project. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 401.4 MW
- 401.4 MW net summer
- Generating units
- 1
- In service
- 2025
- EIA plant ID
- 68200
Where it is
Loading map…
- County
- Eastland County, Texas
- Coordinates
- 32.4382, -99.1577
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Sequoia 1 Solar Project
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Sequoia 1: FAQ
- Where is Sequoia 1?
- In Eastland County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Sequoia 1?
- 401 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Sequoia 1?
- EIA-860M names Sequoia 1 Solar Project as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Sequoia 1 LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sequoia 1 Solar Project here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sequoia 1 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Sequoia 1 still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.