Tyson Nick

Tyson Nick is a 91 MW solar farm in Lamar County, Texas, operated by Tyson Nick Solar Project, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
90.5 MW
90 MW net summer
Generating units
1
In service
2025
EIA plant ID
68856

Where it is

Loading map…
County
Lamar County, Texas
Coordinates
33.6449, -95.627
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tyson Nick Solar Project, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Tyson Nick Solar Project, LLC reports to EIA →

Tyson Nick: FAQ

Where is Tyson Nick?
In Lamar County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Tyson Nick?
91 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Tyson Nick?
EIA-860M names Tyson Nick Solar Project, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Tyson Nick LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tyson Nick Solar Project, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Tyson Nick LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Tyson Nick still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.