Pitts Dudik Solar II

Pitts Dudik Solar II is a 30 MW solar farm in Hill County, Texas, operated by Elawan Pitts Dudik Solar II, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2026.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
30.4 MW
30.4 MW net summer
Generating units
1
In service
2026
Plant code
69674

Where it is

Loading map…
County
Hill County, Texas
Coordinates
31.8917, -96.8792
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Elawan Pitts Dudik Solar II, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Pitts Dudik Solar II: FAQ

Where is Pitts Dudik Solar II?
In Hill County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Pitts Dudik Solar II?
30 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Pitts Dudik Solar II?
Elawan Pitts Dudik Solar II, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Pitts Dudik Solar II LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Elawan Pitts Dudik Solar II, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pitts Dudik Solar II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Pitts Dudik Solar II still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.