Weber State University - Davis Campus PV

Weber State University - Davis Campus PV is a 1 MW solar farm in Davis County, Utah, operated by Tesla Inc.. EIA-860M lists 1 generating unit here. Its unit entered service in 2017.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.3 MW
1.3 MW net summer
Generating units
1
In service
2017
EIA plant ID
60821

Where it is

Loading map…
County
Davis County, Utah
Coordinates
41.099, -111.9822
Balancing authority
WACM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tesla Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Tesla Inc. reports to EIA →

Weber State University - Davis Campus PV: FAQ

Where is Weber State University - Davis Campus PV?
In Davis County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Weber State University - Davis Campus PV?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Weber State University - Davis Campus PV?
EIA-860M names Tesla Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Weber State University - Davis Campus PV LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tesla Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Weber State University - Davis Campus PV LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Weber State University - Davis Campus PV still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.