Battery Storage Projects in Washington
Every operating battery storage project in Washington on EIA-860M for 2026-07: 2 plants, 3 storage units and 4 MW of nameplate capacity across 2 counties.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 2
- 3 generating units
- Nameplate capacity
- 4 MW
- Counties
- 2
- Grid operator
- Mixed
- no single ISO covers a majority
Map of battery storage projects in Washington
Every one of the 2 plants is drawn at the coordinate EIA files for it.
Loading map…
- Battery · 2
List of battery storage projects in Washington
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Glacier Battery StorageBatteries | Puget Sound Energy Inc | Whatcom | 2 | 1 | 2016 | Operating |
| Arlington Microgrid2 technologies | PUD No 1 of Snohomish County - (WA) | Snohomish | 1.5 | 2 | 2019 | Operating |
Largest battery storage projects in Washington
- 1Glacier Battery StorageWhatcom County, Washington2 MW
- 2Arlington MicrogridSnohomish County, Washington1.5 MW
Battery storage projects by county in Washington
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Whatcom | 1 | 2 |
| Snohomish | 1 | 1.5 |
Battery Storage Projects in Washington: FAQ
- How many battery storage projects are in Washington?
- 2, with 4 MW of nameplate capacity between them, spread over 2 counties. That is the EIA-860M operating count for 2026-07.
- Is there a map of Washington battery storage projects?
- Yes — the map above. Each dot is one battery storage project, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest battery storage project in Washington?
- Glacier Battery Storage, at 2 MW. The table is sorted largest first, so the rest follow it.
- Is there a battery storage project near me in Washington?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Washington's battery storage projects?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Washington is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. EIA technology "Batteries" — grid-connected electrochemical storage of 1 MW and above. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.