Biomass Power Plants in Alaska
Every operating biomass power plant in Alaska on EIA-860M for 2026-07: 1 plants, 5 generating units and 12 MW of nameplate capacity across 1 county.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 5 generating units
- Nameplate capacity
- 12 MW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of biomass power plants in Alaska
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Biomass · 1
List of biomass power plants in Alaska
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| JBER Landfill Gas Power PlantLandfill Gas | Doyon Utilities, LLC | Anchorage | 11.5 | 5 | 2012 | Operating |
Largest biomass power plants in Alaska
- 1JBER Landfill Gas Power PlantAnchorage County, Alaska11.5 MW
Biomass power plants by county in Alaska
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Anchorage | 1 | 11.5 |
Biomass Power Plants in Alaska: FAQ
- How many biomass power plants are in Alaska?
- 1, with 12 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Alaska biomass power plants?
- Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest biomass power plant in Alaska?
- JBER Landfill Gas Power Plant, at 12 MW. The table is sorted largest first, so the rest follow it.
- Is there a biomass power plant near me in Alaska?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Alaska's biomass power plants?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Alaska is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Wood and wood waste, landfill gas, municipal solid waste and other waste biomass. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.