Biomass Power Plants in New Mexico
Every operating biomass power plant in New Mexico as of 2026-07: 1 plants, 4 generating units and 7 MW of nameplate capacity across 1 county.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 4 generating units
- Nameplate capacity
- 7 MW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of biomass power plants in New Mexico
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Biomass · 1
List of biomass power plants in New Mexico
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Southside Water Reclamation Plant2 technologies | Albuquerque City of | Bernalillo | 6.6 | 4 | 1987 | Operating |
|---|
Largest biomass power plants in New Mexico
- 1Southside Water Reclamation PlantBernalillo County, New Mexico6.6 MW
Biomass power plants by county in New Mexico
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Bernalillo | 1 | 6.6 |
Biomass Power Plants in New Mexico: FAQ
- How many biomass power plants are in New Mexico?
- 1, with 7 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of New Mexico biomass power plants?
- Yes — the map above. Each dot is one biomass power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest biomass power plant in New Mexico?
- Southside Water Reclamation Plant, at 7 MW. The table is sorted largest first, so the rest follow it.
- Is there a biomass power plant near me in New Mexico?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs New Mexico's biomass power plants?
- No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in New Mexico is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Wood and wood waste, landfill gas, municipal solid waste and other waste biomass. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.